ENGR 324   Susan Firor       Charles Chamberlin
Environmental Monitoring and Data Analysis   822-1959 (no calls after 8 pm please)       Hse. 18, x4346
            mailto://sef2@axe.humboldt.edu       mailto://cec2@axe.humboldt.edu
FALL SEMESTER 2000   http://www.humboldt.edu/~sef2       http://sorrel.humboldt.edu/~cec2
    OFFICE HRS: by appointment       OFFICE HRS: M,W 11-12,1-2
****************** Tentative Outline ******************            
             
                     
  Monday Monday Wednesday Readings     Monday Monday Wednesday Readings
  Lecture Lab Lecture in Devore     Lecture Lab Lecture in Devore
WK 10-11(UA150) 2-5 (SD141) 10-11(UA150) and Deadlines   WK 10-11(UA150) 2-5 (SD141) 10-11(UA150) and Deadlines
                     
1 Intro/Overview Review & Random Sampling Lab Random & Systematic Sampling Ch. 1   10 Intro to Regression Surveying Intro to Regression Ch 12.1-2
  8/28 8/28 8/30       10/30 10/30 11/1 PROJECT OUTLINE & REFS DUE Weds (11/1)
2 Labor Day Point Estimators Ch. 6   11 Simple Linear Regression Lab Simple Linear Regression Ch. 12.3-4
  9/4 9/4 9/6 PROJECT TOPIC DUE Weds (9/6)     11/6 11/6 11/8  
3 Central Limit Theorem Library & Project Discussion Interval Estimators Ch. 7   12 Regression Estimators Lab Regression Estimators Ch. 13.1, Ch. 14.2
  9/11 9/11 9/13 PROJECT OUTLINE & REFS DUE Weds (9/13)     11/13 11/13 11/15  
4 Interval Estimators Lab 2-Sample Intervals Ch. 15.4   13   —————— THANKSGIVING BREAK ——————    
  9/18 9/18 9/20       11/20 11/20 11/22  
5 Interval Estimation & Design Graphics, Excel, & Data Analysis Tools Hypothesis Testing Ch. 8, Ch. 15.1   14 Residual Analysis Lab Residual Analysis Ch. 13.2-13.5
  9/25 9/25 9/27       11/27 11/27 11/29  
6 Hypothesis Testing Lab Power Curves & Design Ch. 9, Ch. 15.3-4   15 Multiple Regression Lab Multiple Regression Ch. 10
  10/2 10/2 10/4 Draft Due - 10am, Mon. 10/2, return by 10am Weds. 10/4     12/4 12/4 12/6 Draft Due - 10am, Mon. 12/4, return by 10am Weds. 12/6
7 Project Presentations Project Presentations Project Presentations     16 Project Presentations Project Presentations Project Presentations FINAL REPORT Due- 10 AM, Monday 12/11
  10/9 10/9 10/11 FINAL REPORT Due- Noon, Friday 10/13     12/11 12/11 12/13 FINAL EXAM UA150, 10:20-12:10
8 Analysis of Variance MIDTERM EXAM Analysis of Variance Ch. 10   TEXTS:       Friday, Dec 22
  10/16 10/16 10/18     1 Devore, Jay, L.(1995) Probability and Statistics for Engineering and the Sciences, 4th ed., Duxbury Press, Pacific Grove, CA
9 Fitting & Testing Distributions Exam Discussion + Mapping Fitting & Testing Distributions Ch. 14.2   2 (Optional) Middleton, M.R.(1997) Data Analysis Using Microsoft Excel, Duxbury Press, New York
  10/23 10/23 10/25 PROJECT TOPIC DUE Weds (10/25)            

Last Updated on 8/21/2000
By Charles Chamberlain